# Haus Zollinger: Lakeside Family Interiors in Meggen

## Cover

### Interiors for a family that lives on the lake

*Shortlist submission · Haus Zollinger, Meggen*

Atelier Imhof Rüegg, Zurich · 22 March 2027

*Living room of a new lakeside house looking out to the water*

*Atelier Imhof Rüegg*

## Our reading

### How we think you want to live

*Our reading*

You did not ask for a beautiful house. You asked for one that five people can use hard, every day, with the lake at the door.

From your letter of 8 March and the plans by Brandenberger Stucki Architekten, we read a family that swims before school from May to October, cooks together most evenings and seats fourteen at Christmas. The house is 412 square metres on three levels, weathertight in September 2027.

What the brief does not contain is a style, and we take that as deliberate. Lakeside houses tend to be designed for the view and for August. Yours will be judged on a wet Tuesday in November. If we have misread you, say so at interview.

## Four moments

### Four moments the house has to hold

We design from use, not from a list of rooms. These are the four we heard most clearly in your brief, and each one decides more of the interior than any finish will.

### Back from the water

Three children and a dog come in from the jetty wet. The lower entrance needs a drained stone floor, warm benches and somewhere towels dry by morning.

*Lake entrance with stone floor and oak bench*

### The evening kitchen

You cook together and talk while you do it. We'd plan the island for four people working at once, with the homework table in sight but out of the way.

*Kitchen island in oak and umber stone*

### Fourteen at Christmas

The long table seats six on an ordinary Tuesday and fourteen in December. It should never look half empty, which is a lighting question before it is a furniture one.

*Long oak dining table at dusk*

### A room that closes

Matthias works from home two days a week and Seraina reads late. One room on the upper level should shut properly, in sound as well as in sight.

*Wool-lined reading room with one armchair*

## Three homes

### Three homes, asked and delivered

Each is a new-build private house completed by the same two people. We have set down what the client asked for in their own terms, then what we handed over.

### Haus Walchwil, above Lake Zug

*Garden-level lake room at Haus Walchwil*

### Haus Herrliberg, Lake Zurich

*Wool-lined study at Haus Herrliberg*

### Haus Ermatingen, Lake Constance

*Lake-level living room at Haus Ermatingen*

## What we bring

We do not bring a house style to Meggen. We bring two people who will learn how your family uses a Tuesday in February.

## The two people

### The two people you would work with

Nobody else leads your house. Annina and Flurin will both be at the interview, and both stay on the project until the last lamp is hung. Seven colleagues support them on drawings and orders.

### Annina Imhof

Partner, lead designer. Annina would lead the brief, the scheme and every material decision. She led all three homes shown here, and trained as a furniture maker before studying interior architecture in Lucerne.

*Material samples laid out on an oak table*

### Flurin Rüegg

Partner, interior architect. Flurin would run joinery, lighting and site. He draws every joinery detail himself and has coordinated eleven timber-frame houses, two of them with Brandenberger Stucki Architekten.

*Oak joinery corner with a brass pull*

## The first six weeks

### The first six weeks on your house

If you appoint us, this is what happens before any scheme is drawn. The dates assume an appointment by Friday 30 April 2027.

### 1. Two days inside your routine

Week 1, from Monday 10 May. Annina spends a weekday and a Saturday with you in your current home in Zug, noting where bags, shoes, laptops and wet towels land.

### 2. Site walk with your architects

Week 2. Flurin walks the shell in Meggen with Brandenberger Stucki to fix what can still move: socket positions, wall build-ups behind joinery, and the ceiling voids the lighting needs.

### 3. The brief, written back

Week 3. A twelve-page brief by room and by person, including what each child told us. You correct it in a shared document until it is right.

### 4. Three rooms in 3D

Weeks 4 and 5. We model the lake room, the kitchen and one bedroom in photoreal 3D, with true daylight for Meggen in June and in December, before proposing anything for the rest.

### 5. Budget range and lead times

Week 6, by Friday 18 June. A furniture budget as a range with 10 percent contingency, and the long lead items named: upholstery at 12 to 16 weeks, joinery at 10.

## References

### From two clients and an architect

All three have agreed to take a call from you before the interview.

> We asked for a house the dogs could not ruin. Two winters of wet paws on that stone floor, and the lake room is the only room nobody has asked me to change.

— Beatrice Hunziker, Client, Haus Walchwil

> Flurin sent us the joinery setting-out before our timber frame went to the factory. We moved eleven sockets and one wall on paper. On site that would have cost three weeks.

— Reto Ammann, Partner, Ammann Gisler Architekten

> Their shared tracker showed every order, deposit and delivery date. When a sofa slipped four weeks we knew the same afternoon, and a loan piece was in place for moving day.

— Dominik Aebersold, Client, Haus Herrliberg

## Our questions

### What we would ask you at interview

A shortlist interview is usually the studio presenting. We would rather spend half of the ninety minutes on these six.

### Where things land when you come home

Bags, keys, wet swimwear, football boots, the post. In most houses the answer is the kitchen island, and the island then stops being a kitchen.

We would ask each of you separately, children included. The answers decide the lower entrance and probably the size of the island.

### The room in your current home that you avoid

Every family has one. The reason is rarely the furniture. It is usually light, noise, or the fact that the room is on the way to somewhere else.

Knowing it tells us what not to repeat in Meggen.

### How the house should feel in February

The drawings show a summer house: terraces, the jetty, glass to the water. You will spend more evenings in it in the dark than in the sun.

We would ask what a good winter evening looks like for you, because the lighting, the textiles and the fireplace wall all follow from it.

### What you already own and want to keep

A piano, a table from a grandparent, paintings, a sofa nobody will give up. We design around these, not past them.

Please bring photographs and rough sizes. It changes the furniture budget more than any other answer.

### Who decides, and how quickly

We would ask who signs off a scheme, who signs off an order, and what happens when the two of you disagree.

Upholstery and joinery are ordered months ahead. A decision that waits three weeks moves the installation by three weeks.

### What would make you regret appointing us

We would rather hear it at interview than at handover. Past clients have named three things: too many options, partners who vanish after the first month, and surprises on cost.

Tell us yours and we will say plainly whether we can promise it.

## Interview date

### This only confirms the interview date

Sliding to confirm tells us that Thursday 15 April 2027 at 14:00 suits you. It does not appoint us, agree a fee or commit you to anything. The line about signing under the slider is standard wording, and here it covers the date alone.

### Prepared by

**Annina Imhof**
Partner, Atelier Imhof Rüegg

Feldeggstrasse 47
8008 Zürich
annina@imhofruegg.ch

### For confirmation by

**Seraina and Matthias Zollinger**
Haus Zollinger, Meggen

Submitted on Monday 22 March 2027. We would need about ninety minutes, and we would like the children there for the first twenty.

### Confirm Thursday 15 April 2027 at 14:00

By confirming, you confirm the interview only: Thursday 15 April 2027, 14:00 to 15:30, at our studio, Feldeggstrasse 47, Zurich. No fee and no appointment are agreed. If the date does not suit, reply to Annina and we will offer two others that week.