# Materials and lighting presentation for Olmea, Turin

## Cover

### Materials and lighting for Olmea

*Developed design · Olmea, Turin*

Presented by Beltramo Quaglia Interni on Tuesday 20 April 2027. The palette space by space, two lighting schemes, and the one approval that lets procurement start on Monday 3 May.

*Travertine, chestnut, ochre wool, brass and lime plaster samples laid flat*

*Beltramo Quaglia Interni*

## The approved concept

### The concept, read back in two lines

*Approved 12 March 2027*

A studio that feels like the hour after rain: warm underfoot, quiet to the ear, lit so that nobody squints. Three steps from the bright street to the dim treatment rooms, each one calmer than the last.

Nothing here reopens that. Developed design is the stage where an idea becomes a list of things with a supplier, a price and a lead time. This is that list for your 212 square metres on Via Nizza: reception, the retail wall, four treatment rooms and the corridor between them.

We are asking you, Ottavia, for two decisions. The material palette as shown. And one of two lighting schemes, which differ in mood, in running cost and in how long they take to arrive. If we have misread what you approved in March, tell us before you read on.

## The idea behind both

Your clients spend most of an hour on their backs. The ceiling is the room, and the light should never look back at them.

## Palette by space

### The palette, space by space

Five materials carry the whole studio. Each appears in every space in a different proportion, so the rooms read as one place and not as four schemes.

### Reception: travertine and lime plaster

*Travertine reception desk against bone lime plaster*

### Retail wall: chestnut and brushed brass

*Chestnut shelves on a brass rail in a plaster recess*

### Treatment rooms: cork, wool and plaster

*Treatment room with cork floor and ochre wool curtain*

### Corridor and changing: one shade darker

*Clay plaster corridor with chestnut doors*

## The sample tray

The five materials at full size, photographed in north light at our studio on Via Bonafous. The tray itself travels to site whenever you want to see it against the real daylight.

*Honed unfilled travertine*

*Hand-trowelled lime plaster in bone*

*Oiled chestnut*

*Ochre wool bouclé*

*Brushed brass rail samples on travertine*

*Cork floor tile and clay plaster*

## Two lighting schemes

### Scheme A, the cove: reception

*Reception under even indirect cove light*

### Scheme A, the cove: treatment room

*Treatment room with a soft lit ceiling edge*

### Scheme B, the pools: reception

*Reception with three glass pendants and a dark ceiling*

### Scheme B, the pools: treatment room

*Treatment room with two low wall lights*

## What each scheme changes

Mood is on the previous pages. These are the three numbers behind it, taken from lighting schedule revision C. Both schemes sit inside the lighting allowance you approved with the concept.

### Scheme A, yearly electricity

**€1,277**

At 3,100 opening hours and 0.29 EUR per kilowatt hour.

### Scheme A, lead time

**6 weeks**

Order to delivery in Turin. Linear fittings cut to length by the supplier.

### Scheme A, connected load

**1,420 W**

Every fitting at full output. 31 percent lower than Scheme B.

### Scheme B, yearly electricity

**€1,843**

The same hours and tariff. 566 EUR a year more than Scheme A.

### Scheme B, lead time

**11 weeks**

The glass is blown to order, and the workshop closes in August.

### Scheme B, connected load

**2,050 W**

Forty-six visible points against nine concealed runs in Scheme A.

## Our recommendation

### We recommend Scheme A

*Our recommendation*

Scheme B makes the better photograph. Scheme A makes the better hour, and the hour is what Olmea sells.

A studio like yours is judged from a treatment bed, face up, eyes half closed. Scheme B puts a bright point at the edge of that view in every room. Scheme A puts nothing there at all, and it lets the therapist take a room from clear to dim in one gesture.

It also arrives five weeks sooner and draws 31 percent less power. What you give up is the drama of the pendants over the desk, and we do not pretend that is nothing. If reception feels too even once it is lit, one pendant can be added later without opening the ceiling.

## Fixed and still open

### What your approval fixes, and what can still move

Approval releases orders with deposits attached. From Monday 3 May the first two are in production, and a change to either means a new order and a new lead time.

### Fixed: stone and plaster

Travertine quantities, slab sizes and finish, and both plaster tones. The quarry cuts to our schedule, so a change after 3 May means a new block and seven more weeks.

### Fixed: joinery and lighting

The reception desk, the retail wall, the doors and the lighting scheme you choose. Coves or wall points are built in at first fix, so the two schemes cannot be swapped later.

### Open until 28 May

The colourway of the wool curtains and the linen for the beds. Three ochres are on the tray. The mill needs your choice by Friday 28 May.

### Open until 18 June

Loose furniture in reception, the retail display vessels and the planting. Nothing here has a lead time over eight weeks, so it all stays open until Friday 18 June.

## Approval to opening

### From approval to opening day

These dates assume approval by Friday 30 April and Scheme A. With Scheme B the opening holds only if nothing slips, because the glass workshop closes for three weeks in August.

### 1. Orders placed, 3 to 7 May

Stone, joinery and lighting go out in the first week, each with a 40 percent deposit from the project account. Every order appears in your live FF&E tracker the day it is placed.

### 2. Lead times, May to July

Lighting arrives in six weeks, stone in seven, joinery in ten. Joinery sets the pace: the desk and retail wall reach site on Monday 12 July. We visit the workshop on Tuesday 8 June.

### 3. Installation, 12 July to 6 August

Stone first, then joinery, then second-fix lighting and the plaster top coat. The site closes from 9 to 20 August, as most sites in Turin do.

### 4. Commissioning, 30 August to 10 September

Lighting scenes are set room by room with your lead therapist on the bed, not from a drawing. Snagging runs alongside, with a signed list by Friday 10 September.

### 5. Styling and opening, 20 September

Curtains, linen and loose furniture go in from 13 to 17 September, and the rooms are photographed empty on the Friday. Olmea opens on Monday 20 September 2027.

## Approval

### Approve the material palette and lighting Scheme A

This is the approval that starts procurement. It covers the palette as presented and Scheme A, the cove, in every space. It is needed by Friday 30 April 2027. If you prefer Scheme B, write to Costanza before then and we will reissue this page for it.

### Prepared by

**Costanza Beltramo**
Founding partner, Beltramo Quaglia Interni

Lighting by Ettore Quaglia, partner

Via Bonafous 14
10123 Torino
costanza@beltramoquaglia.it

### For approval by

**Ottavia Morandini**
Founder, Olmea
Via Nizza 148, 10126 Torino

Both schemes will be mocked up over a treatment bed on site on Tuesday 27 April from 9:00, if you would like to lie under them before you decide.

### Approve the palette and lighting Scheme A

By approving, you confirm the material palette shown in this presentation and lighting Scheme A for reception, the retail wall, the corridor and all four treatment rooms. We place the stone, joinery and lighting orders from Monday 3 May 2027 and hold the opening on Monday 20 September 2027.