---
title: "Why We Should Design Saarni Satama | Saarni Hotels Bid"
description: "Smilga Vanags Interiors' shortlist submission for the 86-room Saarni Satama harbour hotel: our reading of the brief, closest projects and team."
canonical: "https://formlio.com/documents/riga-interior-design-shortlist-submission"
locale: "en"
type: "document"
lastModified: "2026-11-11"
---

# Why We Should Design Saarni Satama | Saarni Hotels Bid

## Cover

### Why we should design Saarni Satama

*Shortlist submission · Saarni Hotels*

Our reading of your brief for the 86-room harbour hotel, the completed projects closest to it, the four people who would do the work, and what we will bring to interview.

- Prepared for: Tuuli Harjanne, Saarni Hotels
- Submitted: 10 May 2027
- Interview: 26 May 2027, Helsinki

*Hotel lobby in pale ash and limestone with a window onto the harbour*

*Smilga Vanags Interiors*

## Your brief

### What we think you are asking for

*Your brief*

Saarni Satama is your third hotel and your first new building. The first two taught guests what Saarni feels like. This one has to prove the feeling survives 86 rooms.

You asked four studios for interiors across the guest rooms, the ground-floor restaurant and the rooftop sauna floor, in a shell that Verkko Arkkitehdit hand over in January 2028, for an opening in May 2028. You asked for no fee at this stage, and there is none here.

We read the real risk as time, not taste. Sixteen weeks between shell and first guests means every long-lead item is ordered before the building exists. If we have any of this wrong, tell us before the interview and we will come prepared for the brief you meant.

## Our position

A hotel between a ferry terminal and the open sea should feel like shelter first, and like design only when you look twice.

## The studio in numbers

### Eleven people, one kind of project

Smilga Vanags Interiors has worked from Riga since 2016. We design places people stay, eat and bathe on the Baltic coast, and we turn down the rest.

### Hotels opened since 2016

**6**

### Guest rooms delivered

**412**

### FF&E delivered before install

**97%**

### Sauna and bathing houses

**3**

## Relevant projects

### Three completed projects closest to yours

Chosen because each one tested a part of your brief: a new-build hotel against a fixed opening, a sauna that takes daily public use, and a restaurant where the room has to stay quiet when full.

### Hotel Molle, Liepāja

*Hotel guest room in pale ash and oat linen facing the sea*

### Pirts Nams, Rīga

*Sauna with tiered dark ash benches and a narrow window onto water*

### Restoran Sool, Tallinn

*Restaurant with moss green banquettes and a timber ceiling raft*

## References

### What those clients say

All three have agreed to take a call from your panel before the interview. Their direct lines came with the email that carried this submission.

> They ordered the upholstery eleven weeks before we had a building, off one mock-up room. I thought it was reckless. We opened on the planned date with every room finished, and I have stopped arguing with them about lead times.

— Annija Bērziņa, General Manager, Hotel Molle

> A sauna used by 300 people a day destroys soft timber in a season. They specified for the fifth winter, not the opening photographs, and after the first one we had not replaced a single bench.

— Dace Liepniece, Founder, Pirts Nams

> On a full Friday you can still hear the person opposite you. Guests do not know why they stay longer, but they stay 22 minutes longer, and that is a second bottle on most tables.

— Märt Kuusik, Owner, Restoran Sool

## Your team

### The four people who would do the work

This is not a pitch team. These four come to the interview, and the same four run Saarni Satama from the first workshop to the opening week.

### Ilze Smilga

Founding partner and design lead. Led the concept for Hotel Molle and Pirts Nams. She would hold the design from the first workshop and present every stage to your board herself.

### Kristaps Vanags

Partner, technical and delivery. Coordinates with the architect and contractor in IFC, and owns the joinery packages. He would be your contact for programme and site.

### Madara Ozola

Senior designer, FF&E and specification. Ran procurement for 54 rooms at Hotel Molle through the live tracker you will see at interview. She would run yours.

### Rihards Kalve

Lighting and acoustics lead, in house. Modelled the 0.6 second room at Restoran Sool. He would set the targets for your restaurant and sauna floor before any finish is chosen.

## Our approach

### Start with one room, built for real

*Full-size guest room mock-up in a workshop*

### One material family for 86 rooms

*Samples of ash, wool, limestone and bronze laid flat*

### Treat the sauna floor as the lobby

*Rooftop sauna lounge with a long window onto the open sea*

### Set the sound before the finishes

*Timber acoustic ceiling raft above a wool banquette*

## At interview

### What happens at interview

Ninety minutes on Wednesday 26 May 2027, 10:00 to 11:30, at your Helsinki office. No slides after the first ten minutes.

### 1. Your brief, challenged

Ten minutes. Ilze sets out the two points where we would push back on the brief, and what each would change for guests and for the opening date.

### 2. A room corner, at full size

Twenty-five minutes. We bring a built corner of a guest room: headboard panel, bedside, wall finish and reading light. Touch it, lean on it, try to mark it.

### 3. The live FF&E tracker

Twenty minutes. Madara opens the Hotel Molle tracker as it ran: every item, lead time and order date. Then the same view, drafted for your 86 rooms.

### 4. Your questions, our people

Thirty-five minutes. Ask the person who would do the task. The partners will not answer for the team, and we will say so when we do not know.

## Practical notes

### The practical questions

The things a selection panel asks in the last five minutes, answered before the first.

### Why there is no fee in this submission

You asked for none at this stage, and we agree with that order. A fee quoted before the interview is a guess about scope.

If you want one after 26 May, we will send it within five working days. It would be a fixed design fee by stage, with FF&E procurement priced separately as a percentage of goods value, so the two are never blended.

### Our capacity from July 2027 to opening

We have two live projects. One completes in August 2027. From September, Saarni Satama would be the largest project in the studio, and the four people named above would give it between half and all of their week depending on the stage.

We would not take another hotel of this size before your opening.

### Working between Riga and Helsinki

The flight is 65 minutes. A designer would be in Helsinki every second week during design and every week from shell handover in January 2028.

We work in English, issue models in IFC to your architect, and document fire classification and CE marking for every specified item, as we did for our Estonian projects.

### Conflicts of interest

We have no hotel, restaurant or sauna work in Helsinki, live or under discussion.

If appointed, we would not accept another hotel commission within two kilometres of the site until 24 months after your opening.

### What we would like before the interview

Three things, if you can share them: the architect's general arrangement plans, the guest feedback summary from your two existing hotels, and the FF&E budget as a range.

None is required. Each makes the room corner and the draft tracker closer to your project.

### Insurance and references

Professional indemnity cover of EUR 2,000,000 per claim, with the certificate available on request.

Annija Bērziņa, Dace Liepniece and Märt Kuusik have each agreed to take a call from your panel. Their direct lines are in the email that carried this submission.

## Next step

### One step now: hold the interview slot

You have told the four studios that a decision follows by Friday 11 June 2027. If we are appointed, we would hold Monday 5 July 2027 for the first workshop in Helsinki.

### Prepared by

**Ilze Smilga**
Founding partner, Smilga Vanags Interiors

Tallinas iela 41
Rīga, LV-1012
ilze@smilgavanags.lv

### For confirmation by

**Tuuli Harjanne**
Development Director, Saarni Hotels

If another time on 26 May suits your panel better, reply to Ilze and we will move. The room corner travels by ferry the day before.

### Confirm our interview slot

By confirming, you hold Wednesday 26 May 2027, 10:00 to 11:30, at Saarni Hotels' Helsinki office for Smilga Vanags Interiors. This appoints no one and agrees no fee. We will send the room corner's delivery details the same day.
