Made with Formlio


Empty co-working floor with oak desks and burgundy chairs


Fabrègue Aillaud



A design retainer for four openings in 2027



Prepared by

Fabrègue Aillaud, Marseille

Prepared for

Palanque

Term

1 March to 31 December 2027

Monthly fee

From €9,120 HT

Empty co-working floor with oak desks and burgundy chairs
The brief



What you asked for



Palanque opens four sites between July and December 2027: Lyon, Toulouse, Nice and Bordeaux. You asked for one design partner for all four, on one fee.



Your Series B closed in January 2027 and the four leases are signed. Your sites in Marseille, Aix and Montpellier were each designed under a separate contract, by three studios. Members notice. The phone booths differ, the desk depths differ, the chairs differ.

What is at stake is the calendar. Each lease carries rent from the handover date, so a week lost to a fee negotiation is a week of rent on an empty floor.

If we have any of this wrong, tell us before you read the rest.

Four openings in five months leave no room for four fee negotiations. One retainer covers every site, from first survey to opening week.

Why a retainer, not four projects



A project per site means four scopes, four fee letters and four kick-offs. The work repeats. The contract should not. On our last multi-site programme each fee letter took three weeks. A retainer keeps one team on every site and moves its days to the next opening.




0



Openings, July to December


0 m²



Floor area to fit


0 weeks



Minimum furniture lead time


0 weeks



Saved on each site

What each month includes



Five kinds of work, drawn from one monthly allowance of studio days. The mix changes with the calendar. The team does not.



Site surveys

A measured survey of each shell within ten working days of handover: 3D scan, services positions, daylight readings, acoustic baseline. The model is shared the same week. Layouts start from what is there, not from the landlord's drawings.


Empty office shell before fit-out

Layouts

Desk plans, meeting rooms and phone booths tested against your ratios: 6.9 m² per desk, one booth per 14 members. You walk each floor in VR before anything is ordered. Two rounds of changes per site are included.


Row of glass-fronted meeting rooms and phone booths

FF&E packs

One furniture, fixtures and equipment schedule per site, built from the Palanque kit of 62 standard items, with local substitutions flagged. Each line carries supplier, lead time and price. You approve in the live tracker, line by line.


Material samples laid flat: wool, oak, terrazzo, steel and felt

Supplier management

We place and chase every order on your account. Eleven suppliers, one tracker, one status update a week. Trade discounts pass to you in full. We take no margin on goods.


New upholstered chairs and oak table frames in a workshop

Opening-week snagging

Bastien Aillaud is on site for the five days before each opening. Every defect is logged with a photo, an owner and a date. The list is closed, or priced, before members arrive on the Monday.


Finished co-working lounge at dusk, lights on

How a month runs



The same five fixed points every month. Maëlys Fabrègue holds the account and chairs each one.



Planning call, first Tuesday

Forty-five minutes with Hortense Vidalenc's team. We agree where the month's days go, site by site. If a new lease lands mid-month, something moves, and we say what.

Work in the open

Drawings, schedules and orders sit in one shared tracker. You see the status without asking. Requests come through one inbox, not three phones.

Site day, every second Thursday

One of us is on a live site every second Thursday. Photos and notes are in the tracker by the evening.

Your answer in three days

Anything we send for approval needs an answer within three working days. A later answer moves the order date, and the lead time does the rest.

Month close, last Friday

One page: days used against the allowance, orders placed, what rolls forward. No slide deck.

The openings calendar



Four sites, two stages each. The gap between them is supplier lead time: eleven weeks minimum from order to install. It is the one part of the calendar nobody can compress. No more than two sites are live at once.



Lyon Part-DieuMar 1 - Apr 9

Lyon: design and orders

Part-Dieu, 2,350 m². Survey, layouts, FF&E pack. Orders placed by 9 April.

Toulouse CompansApr 19 - Jun 4

Toulouse: design and orders

Compans, 1,800 m². Orders placed by 4 June.

Nice ArénasMay 24 - Jul 9

Nice: design and orders

Arénas, 1,500 m². Orders placed by 9 July.

Lyon Part-DieuJun 28 - Jul 16

Lyon: install and opening

Snagging 5 to 9 July. Opens Monday 12 July.

Bordeaux EuratlantiqueJul 26 - Sep 10

Bordeaux: design and orders

Euratlantique, 2,900 m². Orders placed by 10 September.

Toulouse CompansAug 23 - Sep 10

Toulouse: install and opening

Snagging 30 August to 3 September. Opens Monday 6 September.

Nice ArénasSep 27 - Oct 15

Nice: install and opening

Snagging 4 to 8 October. Opens Monday 11 October.

Bordeaux EuratlantiqueNov 29 - Dec 17

Bordeaux: install and opening

Snagging 6 to 10 December. Opens Monday 13 December.

Tessel Cliniques, six day clinics

Six clinics fitted out in fourteen months on one retainer, from a waiting-room kit of 38 items. By the fifth site the FF&E pack took four days, not fifteen.


Clinic waiting room with oak bench and rose seat pads

Calade Hôtels, three lobbies

Three lobby and lounge fit-outs in Marseille, Nîmes and Sète. Shared joinery details cut the workshop cost per lobby by 17% between the first and the third.


Hotel lobby with stone desk and burgundy armchairs

Résidences Aubier, four study lounges

Four student residences, four study lounges, one supplier list. Every lounge opened on the first day of term. Each snag list closed within five days of opening.


Study lounge with oak tables and burgundy benches

Clients on their third, fourth and sixth site



By clinic four we had stopped reading fee letters, because there were none. The monthly page told me days used and orders placed. Site five was priced in two days.

Nour Benchekroun

Head of Estates, Tessel Cliniques

Bastien found a 40 mm error in the Sète reception desk drawings the week before the workshop cut the stone. That would have cost us the opening weekend.

Raphaël Estienne

Operations Director, Calade Hôtels

At the first review they told us to drop a tier for two months, because the calendar was quiet. Then they asked for it back in June. Both calls were right.

Capucine Daumas

Development Director, Résidences Aubier

The monthly fee



All figures in euros, HT. TVA at 20% is added on invoice. Pick one tier. Your calendar never has more than two sites live at once, so we recommend the middle one. Furniture and fittings are bought on your account and are not in these figures.



Monthly tiers

Invoiced on the first working day of each month. You can move tier at each quarterly review.

One site live

12 studio days a month at 760. One site in design or install at a time.

Total
$9120.00/ month

One site live

12 studio days a month at 760. One site in design or install at a time.

Item
Price
Quantity
Total

Design and layout days

8 days: surveys, layouts, 3D and VR.



$6080.00/ month

FF&E and supplier days

4 days: schedules, orders, site.



$3040.00/ month
Total
$9120.00/ month

Two sites live

22 studio days a month at 735. Two sites in design or install at once. Recommended.

Total
$16170.00/ month

Two sites live

22 studio days a month at 735. Two sites in design or install at once. Recommended.

Item
Price
Quantity
Total

Design and layout days

15 days: surveys, layouts, 3D and VR.



$11025.00/ month

FF&E and supplier days

7 days: schedules, orders, site.



$5145.00/ month
Total
$16170.00/ month

Three sites live

32 studio days a month at 710. For a fifth lease or a compressed calendar.

Total
$22720.00/ month

Three sites live

32 studio days a month at 710. For a fifth lease or a compressed calendar.

Item
Price
Quantity
Total

Design and layout days

21 days: surveys, layouts, 3D and VR.



$14910.00/ month

FF&E and supplier days

11 days: schedules, orders, site.



$7810.00/ month
Total
$22720.00/ month

Setup and add-ons

Setup is invoiced once, on signature. Add-ons are priced per use: tick what you want and the total updates.

Setup, one-off

13.5 days at 760, in March 2027.

Total
$10260.00

Setup, one-off

13.5 days at 760, in March 2027.

Item
Price
Quantity
Total

Standards audit of your four open sites

4.5 days. What to keep, what to stop repeating.



$3420.00

The Palanque kit

7 days. 62 standard furniture and finish items, priced, with lead times.



$5320.00

Tracker and supplier onboarding

2 days. Eleven supplier accounts opened in your name.



$1520.00
Total
$10260.00

Optional add-ons

Each is a one-off, per site or per day.

Total
$0.00

Optional add-ons

Each is a one-off, per site or per day.

Item
Price
Quantity
Total

Acoustic survey and report, per site

3 days, with measured reverberation times.



$2280.00

Opening-week photography, per site

One day on site, 25 edited images.



$1850.00

VR walkthrough for your sales team, per site

2 days. For pre-letting before the opening.



$1520.00

Extra studio day

Agreed in writing before it is used.



$760.00
Total
$0.00





Subtotal
$10260.00
Total (before tax)
$10260.00
TVA (20%)
$2052.00
Total
$12312.00
Subtotal
$16170.00/ month
Total (before tax)
$16170.00/ month
TVA (20%)
$3234.00/ month
Total
$19404.00/ month

Notice, review and the small print



Written down now, so nothing needs arguing in October.



Term and notice

The retainer runs from Monday 1 March to Friday 31 December 2027. The first three months are fixed. From 1 June either side can end it with 60 days' written notice. Work in progress is handed over with drawings, schedules and open orders. Nothing is held back.

Quarterly review

We review on Tuesday 1 June, Wednesday 1 September and Wednesday 1 December. Each review looks at days used, the calendar ahead and the tier. You can move up or down one tier from the following month. A new lease between reviews triggers a review within ten working days.

Unused and extra days

Up to three unused days roll into the next month, once. Beyond that they lapse. Days over the allowance are agreed in writing first and charged at 760 euros HT. We tell you when a month reaches 80% of its allowance.

What the fee does not cover

Furniture, fittings and equipment. Building works, mechanical and electrical design, fire strategy and landlord approvals. Travel outside the four cities. FF&E budgets run from 410 to 560 euros per m², with a 10% contingency, and are approved per site.

Orders, deposits and changes

Hortense Vidalenc signs off every order in the tracker. Suppliers invoice Palanque directly, and most ask for a 40% deposit. If a line changes after ordering, the deposit is usually lost and the lead time restarts. We give you both numbers before you decide.

Lead times and late approvals

The calendar assumes eleven weeks from order to install, and site access from each handover date in your leases. A late approval moves the install date by the same number of days. An opening date cannot be held by working faster on site.

Photography

We keep the right to photograph finished sites and to publish the images after each opening, once you have approved the selection.

Sign to start on 1 March



Signing commits Palanque to a design retainer from 1 March to 31 December 2027, on the tier selected above, and to the one-off setup fee of 10,260 euros HT. The recommended tier is 16,170 euros HT a month. The first three months are fixed, then 60 days' notice applies. We invoice setup on signature. This offer holds until Friday 12 February 2027.



Prepared by



Maëlys Fabrègue Founding partner, Fabrègue Aillaud

38 rue Paradis 13001 Marseille maelys@fabregue-aillaud.fr

For signature by



Hortense Vidalenc Director of Development, Palanque

12 quai de Rive Neuve 13007 Marseille

If you would rather talk it through first, we have held Thursday 4 February 2027, at your office or ours.

Sign here
By approving this document, you sign it electronically.

Sign to start on 1 March 2027

By signing, Palanque commits to a design retainer from 1 March to 31 December 2027 on the tier selected above, plus the one-off setup fee of 10,260 euros HT. The first three months are fixed, then 60 days' notice applies.