title: "Lakeholm Saunas Design Review, Round Two | Lachance Yoo"
description: "Round two designs for Lakeholm Saunas: home page, dock page, booking flow and member account, ready for sign-off by 15 June 2027."
canonical: "https://formlio.com/documents/kingston-web-design-review-sign-off"
locale: "en"
type: "document"
lastModified: "2026-11-11"
---

# Lakeholm Saunas Design Review, Round Two | Lachance Yoo

## Round two

### Design review, round two

*Lachance Yoo for Lakeholm Saunas*

The home page, a dock page, the booking flow and the member account, ready for your sign-off so that build can begin on 21 June.

- Prepared for: Noëlle Marchildon, Founder
- Issued: Wednesday 9 June 2027
- Sign-off by: Tuesday 15 June 2027

*Lakeholm Saunas booking site on a laptop and a phone*

*Lachance Yoo logo*

## What you approve

### What signing off this round unlocks

*What you are approving*

You are approving four templates and the design tokens beneath them. Every other page on the site is assembled from those parts, which is why this round matters more than its length suggests.

Sign off by Tuesday 15 June and frontend build starts on Monday 21 June, which holds the 14 September launch and leaves a month of support before your Toronto dock opens on 15 October.

If we have not heard by then we lose the build slot, and the next one opens on 12 July. Launch would move to 5 October, ten days before Toronto, which is closer than either of us should be comfortable with.

## The idea

A booking site for a sauna should feel like the walk down to the dock: few decisions, no hurry, and the water in view the whole way.

## The screens

### Home: the water comes first

*Home page opening on the nearest dock*

### Dock page: one place, one evening

*Dock page with session times above the map*

### Booking: three taps to a bench

*Three-step booking flow on phones*

### Member account: the pass, finally visible

*Member account showing sessions left*

## What changed

### What changed since round one

Your comments from 19 May, and what we did with each. We kept two of your suggestions out of this round, and the reasons are in the notes.

### Contrast raised

Ember on ivory failed WCAG 2.2 AA at body size. We darkened it one step in the tokens, so every screen inherits the fix.

### Times above the map

Your front desk said people ring to ask what is free tonight, never where the dock is. The page now answers in that order.

### Account comes later

Removed from the path to payment. In the prototype, booking dropped from seven taps to three on a mid-range Android phone.

### Fewer type sizes

Nine sizes became six. The dock pages lost some of their charm and gained a good deal of calm, a trade we would make again.

## Fixed and movable

### What is fixed, and what can still move

A sign-off is only useful if both of us know where its edges are. These are the edges.

### Fixed once you sign

The design tokens, the four templates, the navigation and the order of the booking flow. Build is written against them from the first day, so a change after sign-off is a change request, priced and dated before anyone starts it.

### What can still move

All copy, all photography, session names and prices, the order of the docks, and anything that lives in Payload. Your team can change these on the day you learn to use the CMS, without asking us, and long after we have gone.

### If you want a third round

The agreed scope covers two rounds. A third would be eight designer days at CA$780, so CA$6,240 plus HST, and would move launch by a week.

We would rather you asked for it than signed something you do not believe in.

### What this round does not cover

Confirmation emails, gift cards and the Toronto waitlist page. They reuse these components and come to you for review during build, in the sprint where they are made.

### Browsers and devices we designed for

The current and previous versions of Safari, Chrome, Edge and Firefox, and phones from the last four years, with a 360px minimum width. The screens you are reviewing were checked on an iPhone and on a mid-range Android, on 4G, from your Portsmouth dock.

## Next stage

### What your sign-off starts

Twelve weeks from first commit to launch, then four weeks of support. Assumes your content arrives by 20 August, because content is where websites go to wait.

| Task | Start | End | Duration | Label |
| --- | --- | --- | --- | --- |
| Tokens and component library | 2027-06-21 | 2027-07-02 | 5 days | Build |
| Booking flow and Stripe | 2027-07-05 | 2027-07-30 | 5 days | Build |
| Payload content types and six dock pages | 2027-07-19 | 2027-08-06 | 5 days | Build |
| Lakeholm loads copy and photography | 2027-08-09 | 2027-08-20 | 5 days | Content |
| UAT with your front-desk team | 2027-08-23 | 2027-09-03 | 5 days | Launch |
| Accessibility and performance audit | 2027-08-30 | 2027-09-10 | 5 days | Launch |
| DNS cutover | 2027-09-14 | 2027-09-15 | 5 days | Launch |
| Post-launch support window | 2027-09-15 | 2027-10-12 | 5 days | Support |

## Sign-off

### Sign off by Tuesday 15 June

Approving below fixes the design tokens and the four templates in this review. Frontend build starts on Monday 21 June and launch holds at 14 September. Copy, photography and prices stay open. If you would like to walk the prototype first, we have held Friday 11 June at your Portsmouth dock.

### Prepared by

**Min-seo Yoo**
Design Director, Lachance Yoo

38 Barrack Row, Kingston, ON K7L 2Y4
minseo@lachanceyoo.ca

### For approval by

**Noëlle Marchildon**
Founder, Lakeholm Saunas

Copied to Étienne Lachance, Technical Lead

### Round two approved

You have approved the design tokens and the four templates in this review. Frontend build starts on Monday 21 June 2027, and launch stays on 14 September. Copy, photography and prices remain yours to change.