Made with Formlio


Lakeholm Saunas booking site on a laptop and a phone


Lachance Yoo logo



Lachance Yoo for Lakeholm Saunas



Design review, round two



The home page, a dock page, the booking flow and the member account, ready for your sign-off so that build can begin on 21 June.

Prepared for

Noëlle Marchildon, Founder



Issued

Wednesday 9 June 2027



Sign-off by

Tuesday 15 June 2027

Lakeholm Saunas booking site on a laptop and a phone
What you are approving



What signing off this round unlocks



You are approving four templates and the design tokens beneath them. Every other page on the site is assembled from those parts, which is why this round matters more than its length suggests.



Sign off by Tuesday 15 June and frontend build starts on Monday 21 June, which holds the 14 September launch and leaves a month of support before your Toronto dock opens on 15 October.

If we have not heard by then we lose the build slot, and the next one opens on 12 July. Launch would move to 5 October, ten days before Toronto, which is closer than either of us should be comfortable with.

A booking site for a sauna should feel like the walk down to the dock: few decisions, no hurry, and the water in view the whole way.

Home: the water comes first

Round one opened on a grid of six docks and read like a branch finder. This round opens on whichever dock is nearest, with tonight's free sessions beneath it, because that is the only question anyone arrives with.


Home page opening on the nearest dock

Dock page: one place, one evening

Each dock now carries its own light, capacity and sessions, drawn from Payload rather than typed six times. The map has moved below the times, since regulars already know the way and newcomers look for it only after they have chosen.


Dock page with session times above the map

Booking: three taps to a bench

Session, people, pay. Round one asked for an account before payment, and you were right to object. An account is now offered after booking, when the reader has a reason to want one, with Stripe handling cards and wallets.


Three-step booking flow on phones

Member account: the pass, finally visible

Members see sessions left, upcoming bookings and one button to bring a guest. It is the least glamorous of the four screens, and the one your front-desk team told us would save them the most phone calls.


Member account showing sessions left

What changed since round one



Your comments from 19 May, and what we did with each. We kept two of your suggestions out of this round, and the reasons are in the notes.







Contrast raised



Ember on ivory failed WCAG 2.2 AA at body size. We darkened it one step in the tokens, so every screen inherits the fix.





Times above the map



Your front desk said people ring to ask what is free tonight, never where the dock is. The page now answers in that order.





Account comes later



Removed from the path to payment. In the prototype, booking dropped from seven taps to three on a mid-range Android phone.





Fewer type sizes



Nine sizes became six. The dock pages lost some of their charm and gained a good deal of calm, a trade we would make again.

What is fixed, and what can still move



A sign-off is only useful if both of us know where its edges are. These are the edges.



Fixed once you sign

The design tokens, the four templates, the navigation and the order of the booking flow. Build is written against them from the first day, so a change after sign-off is a change request, priced and dated before anyone starts it.

What can still move

All copy, all photography, session names and prices, the order of the docks, and anything that lives in Payload. Your team can change these on the day you learn to use the CMS, without asking us, and long after we have gone.

If you want a third round

The agreed scope covers two rounds. A third would be eight designer days at CA$780, so CA$6,240 plus HST, and would move launch by a week. We would rather you asked for it than signed something you do not believe in.

What this round does not cover

Confirmation emails, gift cards and the Toronto waitlist page. They reuse these components and come to you for review during build, in the sprint where they are made.

Browsers and devices we designed for

The current and previous versions of Safari, Chrome, Edge and Firefox, and phones from the last four years, with a 360px minimum width. The screens you are reviewing were checked on an iPhone and on a mid-range Android, on 4G, from your Portsmouth dock.

What your sign-off starts



Twelve weeks from first commit to launch, then four weeks of support. Assumes your content arrives by 20 August, because content is where websites go to wait.



DayWeekMonthQuarterSemesterYear
M6Jun
M7Jul
M8Aug
M9Sep
M10Oct
M11Nov
Tokens and component library
Booking flow and Stripe
Payload content types and six dock pages
Lakeholm loads copy and photography
UAT with your front-desk team
Accessibility and performance audit
DNS cutover
Post-launch support window
BuildJun 21 - Jul 2

Tokens and component library



Build5 - Jul 30

Booking flow and Stripe



BuildJul 19 - Aug 6

Payload content types and six dock pages



Content9 - Aug 20

Lakeholm loads copy and photography



LaunchAug 23 - Sep 3

UAT with your front-desk team



LaunchAug 30 - Sep 10

Accessibility and performance audit



Launch14 - Sep 15

DNS cutover



SupportSep 15 - Oct 12

Post-launch support window



Sign off by Tuesday 15 June



Approving below fixes the design tokens and the four templates in this review. Frontend build starts on Monday 21 June and launch holds at 14 September. Copy, photography and prices stay open. If you would like to walk the prototype first, we have held Friday 11 June at your Portsmouth dock.



Prepared by



Min-seo Yoo Design Director, Lachance Yoo

38 Barrack Row, Kingston, ON K7L 2Y4 minseo@lachanceyoo.ca

For approval by



Noëlle Marchildon Founder, Lakeholm Saunas

Copied to Étienne Lachance, Technical Lead

Approved
Slide to approve
By approving this document, you sign it electronically.

Round two approved

You have approved the design tokens and the four templates in this review. Frontend build starts on Monday 21 June 2027, and launch stays on 14 September. Copy, photography and prices remain yours to change.