# Welcome to Averline Current 2027 | Client Onboarding Guide

## Welcome

### Welcome to Averline Current 2027

*Client welcome*

- Event dates: October 13 and 14, 2027

- Venue: Stratum Hall, Midtown Atlanta

- Planned for: 900 customers and partners

- Your lead: Tamika Rollins, House Count

*An empty conference hall before doors, seats facing a glowing LED wall under a lighting rig*

*House Count*

## What this is for

Two days in October will shape how 900 customers see Averline for the next year. This is how the 27 weeks before them will run.

## Who you will deal with

Four people carry Current 2027 from kickoff to the report. Tamika is your first call for everything. The other three will contact you directly about their own areas, and each of them copies her.

### Tamika Rollins

Executive producer and your day-to-day lead. She owns the budget, the schedule and every decision log. tamika@housecount.studio, 404 555 0142.

### Garrett Loyola

Technical director. Staging, the LED wall, audio, the livestream and the load-in plan for Stratum Hall. He runs the site visit on April 13.

### Priyanka Deshmukh

Attendee experience lead. Registration, the event app, hotel block, access needs and consent for guest data. She will work closely with your CRM team.

### Wynn Castellaw

Content producer. Session programming, speaker briefings, rehearsals and the run of show. Your product marketing team will hear from Wynn most weeks.

## The first four weeks

April is about agreeing what the event is for and fixing the facts everything else depends on. Nothing is built yet, so this is the cheapest month in which to change your mind.

### 1. Kickoff workshop, April 8

Three hours at your Charlotte office, 10:00 to 13:00. We agree the goals, the audience segments, who decides what, and the three things Current 2027 must not get wrong.

### 2. Site visit, April 13

Garrett walks Stratum Hall with you and the venue team. We scan the rooms that day, so the 3D walkthrough you receive in early June is built on real measurements.

### 3. Two concept routes, April 22

We present two routes for the show identity and the stage. Each comes with its cost and its consequence for the schedule. We will recommend one.

### 4. Baseline budget, April 30

You receive the baseline budget and the live production schedule. From this date, every change is measured against these two documents.

## Planning schedule

### The schedule, counted back from October 13

Every date below is set by doors opening at 08:00 on Wednesday, October 13. The two that cannot move are supplier lock, four weeks out, and final numbers, two weeks out. The live version sits in your shared workspace.

| Task | Start | End | Duration | Label |
| --- | --- | --- | --- | --- |
| Kickoff workshop and site visit | 2027-04-08 | 2027-04-13 | 5 days | Concept |
| Show identity, stage concept and baseline budget | 2027-04-14 | 2027-04-30 | 5 days | Concept |
| Your concept review | 2027-05-03 | 2027-05-07 | 5 days | Concept |
| Floor plan and 3D venue walkthrough | 2027-05-10 | 2027-06-04 | 5 days | Production planning |
| Registration site and event app build | 2027-05-17 | 2027-06-15 | 5 days | Production planning |
| Session programming and speaker briefings | 2027-06-07 | 2027-08-27 | 5 days | Production planning |
| Supplier lock | 2027-09-13 | 2027-09-15 | 5 days | Lock |
| Final numbers and run of show freeze | 2027-09-27 | 2027-09-29 | 5 days | Lock |
| Load-in, rehearsal, two live days and derig | 2027-10-11 | 2027-10-15 | 5 days | Live |
| Guest data and impact report | 2027-10-18 | 2027-10-22 | 5 days | Report |

## The venue

### Stratum Hall, zone by zone

You signed for four spaces in a new-build venue in Midtown. These are the working assumptions for each. They hold until the concept is approved on May 7, and the 3D walkthrough will replace this page in June.

### Main hall, general session

*Main hall set for a keynote with a curved LED wall and rows of empty seats*

### Level two, six breakout rooms

*A bright breakout room with chairs facing a large screen*

### The Charging Yard, demo floor

*A demo floor with lit product stations and two electric vans*

### Roof terrace, evening reception

*A rooftop terrace set for an evening reception at dusk*

## What we need from you

### What we need from you, and by when

Six things, in date order. Each one holds up real work if it is late, and we have said what. If a date looks difficult, tell Tamika now, while there is still room to move it.

### 1. April 9: your decision owner

One named person who can approve on Averline's behalf, and a deputy for the weeks they are away. Without this, approvals wait for a meeting.

### 2. April 16: brand kit and access

Brand guidelines, logo files, the event domain, and a CRM contact for Priyanka. The registration build starts on May 17 and cannot start without them.

### 3. May 7: concept approval

One route chosen, with comments consolidated into a single reply. Floor plans and the stage build start the following Monday.

### 4. May 28: invitation list and consent

Customer segments for the first invitation wave, and consent wording approved by your legal team. Registration opens on June 15 with whatever is approved by then.

### 5. July 16: keynote speakers confirmed

Names, session titles and travel dates for every Averline executive on stage. All of them are needed at rehearsal on October 12.

### 6. September 29: final numbers

Confirmed attendees, dietary requirements and access needs. Catering and seating are ordered against this figure. Numbers can fall afterwards. The cost cannot.

## Decisions and changes

### How decisions and changes are handled

Events go wrong slowly, through small decisions nobody wrote down. These are the rules we will both work to, so that the week of October 11 is uneventful.

### Who decides, and how fast

Your decision owner approves on Averline's behalf. Tamika approves on ours.

We ask for approvals in writing in the shared workspace, and we allow three working days for each. If we have heard nothing by then, we will call. We will not assume silence is a yes.

### What counts as a change

Anything that alters the approved concept, the baseline budget of April 30 or a date in the schedule is a change.

A different session title is not a change. A third keynote is.

### How a change request works

You tell Tamika what you want. Within two working days you receive a one-page change note: what it costs, what it does to the schedule, and what we would recommend instead if there is a cheaper way to get the same result.

Nothing is ordered until your decision owner approves the note. Declining a change is always an option, and it never needs a reason.

### Changes after supplier lock

From September 15, suppliers charge for changes and some cannot be made at all. We will still tell you the options and their cost.

The budget holds an 8 percent contingency for the things nobody predicts. It is spent only with your written approval, and whatever is left is not invoiced.

### Meetings, files and the decision log

A 30-minute status call every Tuesday at 10:00 Eastern, moving to twice a week from September 13.

The live production schedule, the budget tracker and the decision log sit in one shared workspace. Every decision is logged there the same day, with who made it. If it is not in the log, it has not been decided.

### Invoices and who to call if it goes wrong

Invoices follow the schedule in your contract: 50 percent on signature, 30 percent at supplier lock, 20 percent after the report. They come from Odalys Ferrer in our finance team.

If something is not working and Tamika cannot fix it, call Lorraine Baptiste, our founder, on 404 555 0117. She would rather hear it in May than in October.

## Confirm you have read this

### One confirmation, then we start

This adds no new commitment. We ask you to confirm you have read it so that we both begin from the same page. If anything above does not match what you understood when you signed, tell Tamika before the kickoff workshop on April 8.

### Prepared by

**Tamika Rollins**
Executive producer, House Count

675 Halden Street NW, Suite 300
Atlanta, GA 30318
tamika@housecount.studio

### For confirmation by

**Hollis Menard**
VP Marketing, Averline

Copied to Jun Takeda, events lead. Sent Monday, April 5, 2027.

### Confirm you have read this welcome

By confirming, you tell us you have read this document and will name your decision owner by Friday, April 9, 2027. It changes nothing in the agreement signed on April 2. We will then send the kickoff agenda for April 8 and your workspace invitations the same day.